Cookie Consent by Free Privacy Policy Generator

Section 2 - River Avon and floodplain crossing, Chesford

This is the most complex section of K2L. It requires the design and construction of a new 200 metre crossing of the River Avon and floodplain with allowance for a proposed highway scheme to upgrade the A452 between Thickthorn and Bericote roundabouts. Initial survey work has been completed and three conceptual options for a pedestrian cycle bridge have been prepared. Work is ongoing to confirm a preferred alignment and design for the bridge, ensuring that the solution is both cost effective and deliverable. The river crossing will require planning permission.

Next steps

Confirm route alignment and preferred bridge design option.

Timescale

To be confirmed. Construction not expected before 2025.

Update cookies preferences