Final update
The scheme has been a success, having maintained the river crossing for vehicles throughout the year whilst renovating six of the bridge's eight spans. The work on the village side which has included replacing a significant number of stones and repointing large areas of arches and vertical elevations. This has in turn enhanced the appearance of the bridge, improved its resistance to flood conditions and addressed areas at risk to scour below the water level.


