Parade resurfacing

Works to repair and resurface the carriageway along the B4087 The Parade from Regent Street junction up to and including Dormer Place Junction are due to take place between Sunday 16th October 2016 and Friday 28th October 2016 including Sundays 16th and 23rd October, in addition to some evenings.

The works will be carried out under a 24hr full road closure of The Parade from Clarendon Avenue to Dormer Place with additional road closures of Regent Street and Dormer Place on Sundays 16th and 23rd October.

Warwick Street will remain open throughout the works.

Pedestrian access will be cordoned off from the works but access to shops and frontages will remain open at all times.

Expected Hours of working

The Parade

Daytime working

Monday – Friday

07:00 – 17:30hrs

Evening working

Monday 17th & Tuesday 18th

15:00 – 22:00hrs


Regent Street & Dormer Place Junction

Daytime working

Thursday 20th & Friday 21st October 07:00 – 17:30 hrs
  • Lay final tarmac layer Regent Street to Dormer Place & adjust / replace existing ironwork / roadside gullies.
  • Sunday 23rd October – 08:00 – 17:30 hrs
  • Lay final surface layer Regent street junction with The Parade & Dormer Place Junction.
  • Reinstate road markings and traffic signal loops Regent Street junction.
  • Monday 24th October – 07:00 – 17:30 hrs
  • Complete final surface layer & reinstate road markings & traffic signal loops.
  • Tuesday 25th October – 07:00 – 17:30 hrs
  • Complete reinstatement of road markings & installation of traffic signal loops Regent Street to Dormer Place.
  • Carry out Gully cleansing.
  • Wednesday 26th October – 07:00 – 17:30 hrs
  • Complete road markings and cleansing of all road gullies –Complete remove all pedestrian safety barriers and associated signs.

  • Additional Information

    During the works, the following roads will also be closed at their junctions with The Parade:-

  • Regent Grove
  • Hamilton Terrace
  • Euston Place – The one way system in Euston Place will be reversed with access via Hamilton Terrace and exit via Newbold Terrace. On Street parking will be temporarily suspended with access for deliveries and collections only.
  • Throughout the duration of the works, there will be signed diversions in place to assist motorists.

    During the works Mon – Fri, there will be designated pedestrian crossing points at the below locations which will be controlled by specific Pedestrian Marshalls.

    Designated crossing points :-

  • Outside The Town Hall at the existing crossing point.
  • Outside Regent Hotel.
  • Other crossing points at Regent Street Junction will remain in place.

    Sunday’s 16th & 23rd October, additional pedestrian marshals will be located at Regent Street and Dormer Place junctions.

    All Bus Stops will be re-located in Guy Street.

    On Street Parking along Guy Street will be suspended for the duration of the works.

    If during the works you have any concerns, please do not hesitate to contact the contractors Surfacing Manager Paul Kelly who will be in a position to deal with your concerns directly on telephone number 07837- 319323 or the Engineer for the works Peter Garrison on telephone number 01926-414082 (08:00 -17:00hrs) Mon- Fri.

    Diversion route



    roadworks.org

    For the roadworks map to function JavaScript must be enabled in your browser.

    For guidance on how to enable JavaScript this site may be helpful:
    http://enable-javascript.com/


    Feedback