Progress Updates - 30 November 2009

Day Time

St Davids Way

The construction of the footway/cycleway facility on the south side which includes the laying of tactile paving, concrete edgings, sub-base and binder course materials has now been completed. The installation of traffic signal and street lighting ducts and chambers have been completed also.


New footway/cycleway facility constructed up to binder course level, St Davids Way (South-side)

New footway/cycleway facility constructed up to binder course level, St Davids Way (South-side)

A444 (Nuneaton)

The installation of safety barriers in the verge has now been completed. The installation of traffic signal and street lighting ducts, chambers and sockets along this stretch have been completed also.


New safety barrier footings in reinforced concrete beam, A444-Nuneaton (Northbound)

New safety barrier footings in reinforced concrete beam, A444-Nuneaton (Northbound)

St Georges Way

The construction of the footway facility on the north side has been constructed up to surface course level. The construction of the shared-use facility on the south side has been constructed up to binder course level. All the street lighting columns along this stretch have now been installed.


Laying of binder course material, St Georges Way (South-side)

Laying of binder course material, St Georges Way (South-side)

B4113 Coventry Road (Hill Top)

The construction of the shared-use footway/cycleway facility which includes the laying of tactile paving, concrete edgings, sub-base and binder course materials has been completed along this stretch.


New concrete kerbs and tactile paving on the B4113 Coventry Road, Hill top

New concrete kerbs and tactile paving on the B4113 Coventry Road, Hill top

B4113 Coventry Road (Bedworth)

Steady progress is being made on the installation of traffic signal poles, traffic signs and street lighting columns.


Installation of street lighting column on the B4113 Coventry Road, Bedworth

Installation of street lighting column on the B4113 Coventry Road, Bedworth
Night Time

General

Works to resurface the gyratory, all the entry and departure arms to and from the gyratory have now been completed.


Laying of surface course material on the departure arm of St Georges Way

Laying of surface course material on the departure arm of St Georges Way
Progress Updates - 9 November 2009

Day Time

B4113 Coventry Road (Hill Top) to B4113 Coventry Road (Bedworth)

Works to excavate existing concrete kerbs and replace with new has now completed.

The construction of the footway/cycleway facility which includes the laying of tactile paving, concrete edgings, sub-base and binder course materials will continue along this stretch.


New concrete kerbs on the B4113 Coventry Road, Bedworth (Southbound)

New concrete kerbs on the B4113 Coventry Road, Bedworth (Southbound)

A444 (M6-J3)

The slewing of existing Virgin Media ducts has been completed. The installation of traffic signal and street lighting ducts, chambers and sockets along this stretch have been completed also.

Works to excavate for carriageway widening on the near-side lane has been carried out. The widened strip to the eastbound carriageway has been constructed with capping and sub-base material. Works to lay new concrete kerbs along this stretch will continue.


Construction of widened carriageway up to Sub-base level

Construction of widened carriageway up to Sub-base level

A444 (Nuneaton) to St. Georges Way

Steady progress is being made on the installation of traffic signal and street lighting ducts, chambers and sockets.

The construction of the footway facility which includes the laying of tactile paving, concrete edgings, sub-base and binder course materials will continue along this stretch.


New concrete kerbs on the B4113 Coventry Road, Bedworth (southbound)

New concrete kerbs on the B4113 Coventry Road, Bedworth (southbound)
Night Time

A444 (M6-J3) to St. Davids Way

Works to reinstate existing damaged carriageway with new construction has now been completed. Areas of existing carriageway to be planed out to allow for regulating and to match levels where new and existing pavements abut have been carried out.


Planing of existing pavement

Planing of existing pavement

A444 (M6-J3)

Steady progress is being made for raising or lowering of new and existing chamber covers and frames to suit new carriageway levels.


The adjustment of ironwork to suit finished carriageway levels.

The adjustment of ironwork to suit finished carriageway levels

A444 (Nuneaton) – Southbound Carriageway

The widened strip to the southbound off-side carriageway has been constructed with road base and binder course materials up to the existing carriageway level.


Laying of binder course material to southbound carriageway

Laying of binder course material to southbound carriageway
Progress Updates - 26 October 2009

Day Time

Inner-island

All duct crossings for traffic signal, street lighting, British Telecom and E-on have now been installed.


The reinstatement of duct crossing trench in carriageway

The reinstatement of duct crossing trench in carriageway

B4113 Coventry Road (Bedworth) to A444 (M6-J3)

Works to excavate existing concrete kerbs and replace with new has now completed. The installations of traffic signal and street lighting ducts, chambers and sockets have been completed.

The construction of the footway/cycleway facility which includes the laying of tactile paving, concrete edgings, sub-base and binder course materials will continue along this stretch.


New concrete kerbs between the entry arm to the inner-island and exit arm from inner-island

New concrete kerbs between the entry arm (Coventry Road, Bedworth) to the inner-island and exit arm (A444, M6-J3) from inner-island

St. Davids Way to A444 (Nuneaton)

The installation of traffic signal and street lighting ducts, chambers and sockets have been completed. The footway between the entry arm to the inner-island and departure arm of the A444 (Nuneaton) has been constructed up to binder course level.


New footway construction up to binder course level

New footway construction up to binder course level
Night Time

A444 (M6-J3) to St. Davids Way

Work to excavate existing concrete kerbs and replace with new has now been completed. The duct crossing in the carriageway on the exit arm from the inner-island to St. Davids Way has also been installed.


Laying of ducts in carriageway

Laying of ducts in carriageway

A444 (Nuneaton) – Central Reserve


Steady progress is being made in installing the new safety barriers on the central reserve of the A444 (Nuneaton) arm.


Installation of new safety barriers

Installation of new safety barriers

A444 (Nuneaton) – Northbound Carriageway


Breaking up of existing northbound carriageway to allow for southbound carriageway widening and new drainage run in the central reserve of the A444 (Nuneaton) arm.


Break up of existing northbound carriageway

Break up of existing northbound carriageway

A444 (Nuneaton) – Southbound Carriageway


The widened strip to the southbound carriageway has been constructed with road base and binder course materials up to the existing carriageway level.


Laying of binder course material to southbound carriageway

Laying of binder course material to southbound carriageway
Progress Updates - 12 October 2009

Day Time

Inner-island


Most of the works in the inner-island have now been completed. The two CCTV camera poles located north and west of the inner-island have now been installed.


The installation of CCTV camera pole - Gyratory

The installation of CCTV camera pole - Gyratory

St. Georges Way


The installation of traffic signal and street lighting ducts and chambers have been completed. The feeder pillar for street lighting has been installed. Some of the street lighting columns have been erected.

The new footway/cycleway facility has been constructed up to sub-base level. Most of the concrete edging kerbs have also been laid along this stretch.


Laying of concrete edging kerbs to the new shared-use footway/cycleway facility - St. Georges Way

Laying of concrete edging kerbs to the new shared-use footway/cycleway facility - St. Georges Way
Night Time

A444 (M6-J3)


Steady progress is being made to the works on the A444 (M6-J3) arm. The kerbs to widen the out-side lane of the carriageway have now been constructed. The widened strip to the central reserve has now been constructed with road base and binder course materials up to the existing carriageway level.


Laying of road base material – A444 (M6-J3)

Laying of road base material – A444 (M6-J3)

A444 (Nuneaton)


Some of the traffic signal and street lighting ducts, chambers and sockets have been installed.

The widened strip on the verge from Griff Roundabout towards George Eliot Hospital Roundabout has now been constructed with road base and binder course materials up to the existing carriageway level.

Laying of road base material – A444 (Nuneaton)

Laying of road base material – A444 (Nuneaton)
Progress Updates - 28 September 2009

Day Time

Inner-island


Steady progress is being made to the works in the inner-island. The installation of traffic signal and street lighting ducts and chambers have now been completed in the inner-island. Work to the new cycleway across the island is also progressing well with the binder course already laid and new street lighting columns erected.

Both the lay-bys on the east and the west side of the island have been constructed. All the chevron signs have been erected also.


Work on Griff Inner Island

Work on Griff Inner Island

St. Davids Way


Steady progress is also being made on St. Davids Way. The widened strip of the splitter island has now been constructed with road base and binder course materials up to the existing carriageway level. The installation of traffic signal and street lighting ducts, chambers and sockets have been completed on the splitter island also.

The existing bituminous material in the splitter island has been excavated and replaced with sub-soil and topsoil.


Work on St Davids Way Splitter Island

Laying of sub-soil on the splitter island

St. Georges Way


The construction of the footway/cycleway facility including tactile paving on the splitter island has been completed. The installation of traffic signal and street lighting ducts and chambers have been completed also.


Laying St Georges Way Traffic Signal And Street Lighting Ducts

Laying of Traffic Signal and Street Lighting Ducts on the West Verge
Night Time

B4113 Coventry Road (Hill Top)


The widened strip located east of the bridge has now been constructed with road base and binder course materials up to the existing carriageway level.

All the kerbs on the central reserve, including kerbs for the bridge deck have now been constructed.


B4113 Coventry Road Hill Top Night Work

Excavation work on the central reserve of the Bridge Deck
Progress Updates - 14 September 2009

Inner-island


Steady progress is being made to the works in the inner-island. The installation of traffic signal and street lighting ducts and chambers have now been completed in the inner-island. The kerbs to widen the east-side of the inner-island have now been constructed.

The excavation work to install the ducts will also continue in the coned area on the gyratory.


Widening of the gyratory carriageway

Widening of the carriageway - Gyratory

A444 (M6-J3)


Steady progress is also being made on the A444 (M6-J3) arm. Part of the widened strip has been excavated to formation level. The installation of traffic signal and street lighting ducts, chambers and sockets have been completed on the central reserve.

The construction of the footway/cycleway facility which includes the laying of edgings, tactile paving and binder course will continue on the central reserve.


Excavation work on the central reserve - A444 (M6-J3)

Excavation work on the central reserve - A444(M6-J3)

B4113 Coventry Road (Hill Top)


Part of the widened strip has now been constructed up to sub-base level. The installation of traffic signal and street lighting ducts, chambers and sockets have been completed on the central reserve. Edging kerbs to footway/cycleway facility on the central reserve have been constructed.

The construction of the footway/cycleway facility on the central reserve which includes the laying of tactile paving and binder course will continue on this arm.


Excavation work on the central reserve - B4113 Coventry Road

Excavation work on the central reserve – B4113 Coventry Road (Hill Top)

B4113 Coventry Road (Bedworth)


The construction of the footway/cycleway facility in the splitter island has been completed. The installation of traffic signal and street lighting ducts and chambers have been completed also.

New Footway Cycleway Construction - B4113 Coventry Road (Bedworth)

New footway/cycleway construction - B4113 Coventry Road (Bedworth)