Reference No
and date received
AddressProposal SummaryDecision Level and StatusGrid Reference
S685/08CM047

30/10/08
Burton Farm
Bishopton Stratford-Upon-Avon Warwickshire
Retrospective change of use from former contractors yard (nil use) to material recycling facility.
Monitoring Progress
Committee 20/01/2009

Awaiting Decision
SP180567
R1408/08CM046

22/10/08
Boundary Farm
Withybrook Road Bulkington Bedworth Warwickshire
Extension of site area for processing and storage of compost.
Monitoring Progress
Committee 20/01/2009

Awaiting Decision
SP404866
NW1635/08CM045

08/10/08
Atherstone Sewage Treatment Works
Carylon Road
Atherstone
Warwickshire
3 x blower enclosures. Each blower enclosure will measure 1550mm x 1525mm x 1700mm (h). The enclosures will be steel coated for power plant and coloured grey (bs4800 00-a-04). The three enclosures will sit on a 150mm (h) concrete base slab measuring 10500mm (l) x 4500mm (w). Monitoring Progress
Delegated

Awaiting Decision
SP318980
S4365/08CM044

26/09/08
Longstaples
Warwick Road Ettington Stratford-Upon-Avon Warwickshire
Variation of Condition 6 of Planning Permission S4365/07CM026 and Condition 4 of Planning Permission S4365/08CM028 to extend the permitted hours of operation of the materials recovery facility. Monitoring Progress
Committee 15/12/2008

Awaiting Decision
SP267501
NW754/08CM043

01/10/08
Mancetter Road
Hartshill
Nuneaton
Warwickshire
Full height extension to the south east side of the evaporator tower over the lower processing building to accomodate a new staircase to provide emergency exit and operational access. Proposed extension to the north east elevation of the tower at low level to allow improved access to process equipment. Proposed replacement of 3 no. existing storage tanks with 3 no. new tanks at a height of 19.4m Monitoring Progress
Committee 18/11/2008

Awaiting Decision
SP33195
NW57/08CM042

23/09/08
Former Shale Tip
Land on the corner of the Common and Merevale Lane Atherstone
Warwickshire
Compaction of former colliery spoil to create a stable landform for the construction of a sustainable resource recovery park comprising the renewable energy generation facilities of a biomass plant and an anaerobic digestion plant, together with associated plant and buildings, hard standing, access routes and landscaping.
Monitoring Progress
Committee 15/12/2008

Awaiting Decision
SP275975
R1529/08CM041

29/09/08
Manor Farm Frankton SPS Main Street Frankton
Rugby Warwickshire
Extention of the existing sewerage pumping station to provide space for additional underground storm water storage. This involves the change of use of land from agricultural land.
Monitoring Progress
Committee 18/11/2008

Granted
19/11/2008
SP423700
R1528/08CM040

22/09/08
Long Lawford STW
Chapel Street
Long Lawford
Warwickshire
Erection of three GRP kiosks associated with the upgrading of infrastructure at Long Lawford STW.
Monitoring Progress
Delegated

Awaiting Decision
SP469763
R1448/08CM039

22/09/08
Bramcote Wolvey STW
Bazzard Lane
Bramcote
Warwickshire
Erection of 1no. new control enclosure, 1no. emergency shower and eyewash unit, 1no. washwater booster kiosk and associated permitted development works.
Monitoring Progress
Delegated

Granted
11/11/08
SP409886
R410/08CM038

17/09/08
Malpass Farm
Parkfield Road
Rugby
Warwickshire
Development of a climafuel manufacturing facility to supply Rugby Cement Works with solid recovered fuel (climafuel) manufactured from mixed household and commercial and industrial wastes. The facility would combine a range of waste treatment, sorting, recycling and processing equipment to separate and remove recyclable materials from the mixed waste, and shred and biodry non-recycable materials into climafuel.
Monitoring Progress
Committee 20/01/2009

Awaiting Decision
SP489761
S965/08CM037

16/09/08
The Old Cement Works Southam Quarry
Coventry Road
Southam
Warwickshire
Change of use from landfill for cement kiln dust (ckd) arising from Southam Cement Works to landfill for nodulised cement kiln bypass dust (bpd) arising from Rugby Cement Works landscaping and habitat creation. Monitoring Progress
Committee 15/12/2008

Awaiting Decision
SP420633
N23/08CM036

09/09/08
Sita Coventry Metals Recycling Depot
Ironbridge Works
Three Spires Industrial Estate Ibstock Road
Coventry
Construction of noise attenuation barrier.
Monitoring Progress
Committee 18/11/08

Granted
19/11/2008
SP353845
NW6/08CM035

29/08/08
Packington Landfill Site Packington Lane
Little Packington
Meriden
Warwickshire
Development and operation of a new temporary open green waste composting facility, including construction of a composting pad surface water lagoon, screen mound use of existing access and construction of internal haul route.
Monitoring Progress
Committee 18/11/2008

Awaiting Decision
SP212857
NW6/08CM034

29/08/08
Packington Landfill Site
Packington Lane
Little Packington
Nr Meriden
Warwickshire
Development and operation of a wood recycling facility including the preparation at the base with suitable granular material. The facility will use existing access and construction of internal haul road. Monitoring Progress
Committee 18/11/2008

Awaiting Decision
SP212857
S965/08CM033

02/09/08
The Old Cement Works Southam Quarry
Long Itchington
Coventry Road
Southam
Warwickshire
Development of a climafuel manufacturing facility to supply rugby cement works with solid recovered fuel (climafuel) manufactured from mixed household and commercial and industrial waste. The facility would combine a range of waste treatment, sorting,recycling and processing equipment to separate and remove recyclable materials from the mixed wastes, and to shred and biodry non-recyclable materials into climafuel.
Monitoring Progress
Committee 20/01/2009

Awaiting Decision
SP42164
NW864/08CM032

21/07/08
Coleshill Quarry
Gorsey Lane Coleshill Warwickshire
Change of use of land to materials recycling facility and associated equipment store. Monitoring Progress
Committee 07/10/2008

Granted
08/10/08
SP203903
NW754/08CM031

09/07/08
De Mulder & Sons Ltd
Mancetter Road
Hartshill Nuneaton Warwickshire
Construction of a new vehicle and trailer park incorporating the remodelling and partial retention of unauthorised bunding at De Mulder & Sons Ltd Mancetter Road Hartshill Warwickshire
Monitoring Progress
Committee 07/10/2008

Refused
22/10/08
SP33195
N85/08CM030

21/07/08
Judkins Quarry
Tuttle Hill Nuneaton Warwickshire
Installation (retrospective) of a replacement flare and associated gas plant within the permitted landfill gas utilisation compound, including the relocation and removal of two store rooms and gas plant.
Monitoring Progress
Committee 07/10/2008

Granted
08/10/08
SP352927
R821/08CM029

17/06/08
Ryton Mill, London Road Ryton-On-Dunsmore WarwickshireVariation of Condition 1 of Application No. R821/06CM023 to provide a further two years to 14th August 2010.
Monitoring Progress
Committee 08/09/2008

Granted
09/09/08
SP375751
S4365/08CM028

04/07/08
Longstaples
Warwick Road Ettington Stratford-Upon-Avon Warwickshire
Single storey extension to side of proposed Materials Recovery Facility building.
Monitoring Progress
Committee 08/09/2008

Granted
09/09/08
SP267501
R410/08CM027

27/06/08
Rugby Cement Works
Lawford Road Rugby Warwickshire
Retention of weighbridge ticket kiosk for improved monitoring security of inbound and outbound HGV's carrying raw materials at entrance access to Rugby Cement Works. Cement tankers are loaded/monitored elsewhere on site. Monitoring Progress
Committee 08/09/2008

Granted
10/09/08
SP484755
NW6/08CM026

11/06/08
Packington Landfill Site Packington Lane Meriden WarwickshireLandfill gas utilisation facility to generate electricity from landfill gas using reciprocating engines at the Packington Landfill site.
Monitoring Progress
Committee 07/10/2008

Granted
08/10/08

SP212857
R1448/08CM025

25/06/08
Bramcote Wolvey STW
Bazzard Lane Bramcote Warwickshire
Erection of two new chemical dosing units, an emergency shower and eyewash unit and associated permitted development works.
Monitoring Progress
Delegated

Granted
19/08/2008
SP409886
W1974/08CM024

23/06/08
Woodcote Avenue/
Beehive Hill
Kenilworth
Warwickshire
Construction/erection of a ground control kiosk and pumping shaft tank storage facility and permanent access point from Beehive Hill. Monitoring Progress
Committee 08/09/2008

Granted
09/09/08
SP278732
S4510/08CM023

05/06/08
Stratford Agripark
Wincot Lands
Clifford Chambers
Nr Stratford-Upon-Avon
Warwickshire
Erection of single storey portal framed building to accommodate waste transfer station, for animal carcasses, together with internal offices, external service yard, access roadway and landscaping.Monitoring Progress
Committee 18/11/2008

Awaiting Decision
SP178491
R1318/08CM022

01/05/08
Hinckley Service Centre
A5 Watling Street Hinckley Warwickshire
The erection of new recovery & transfer building, improvements to existing office building, provision of designated vehicle and car parking, the relocation and erection of new metals recovery and storage building, the provision of open bays for metal segregation, the relocation of weighbridge and wheel cleaning facilities, the provision of security palisade fencing, site drainage improvements and hard standing.
Monitoring Progress
Committee 22/07/2008
Granted
23/07/08

SP404923
S1751/08CM021

25/04/08
Ufton Landfill Site
Ufton
Southam
Royal Leamington Spa Warwickshire
New reception compound including material recovery, in-vessel composting and office facilities. Monitoring Progress
Committee 22/07/2008
Granted
08/10/08
SP390612
NW1317/08CM020

14/04/08
Blabers Hall Farm
Fillongley Warwickshire
Variation of Condition 9 of Planning Permission consent NW1317/06CM013 to increase loads currently permitted from six per week to a maximum of ten per day.
Monitoring Progress
Committee 09/06/2008

Awaiting Decision
SP252864
S4757/08CM019

07/04/08
Grass verge opposite the junction of Mill Lane and Banbury Road Kineton WarwickshireErection of a ground level control kiosk (dimensions 660mm x 280mm x 1570mm high) constructed in stainless steel, coloured holly green to house electronic monitoring equipment.
Monitoring Progress
Committee 09/06/2008

Granted
07/07/2008
SP339509
S1092/08CM018

31/03/08
Unit 6
Butlin House
Bourne End
Kineton Road Industrial Estate Southam Warwickshire
Alteration to existing building structure, erection of perimeter fencing and change of use of land and buildings to waste transfer station and materials recycling facility.
Monitoring Progress
Committee 09/06/2008

Granted

10/06/08

SP413611
R1524/08CM017

04/04/08
Wood Street
Rugby Warwickshire
Installation of a kiosk (660mm x 280mm x 1110mm) to house electronic equipment to monitor the overflow level of a combined storm overflow that overflows into a nearby watercourse. The kiosk will be linked by an underground duct to the combined storm overflow manhole.
Monitoring Progress
Committee 09/06/2008

Granted
22/05/08
SP507758
NW1987/08CM016

31/03/08
Grass Verge to West of Main Road
Shuttington
Warwickshire
Installation of a ground level kiosk (dimension 660mm x 280mm x 1570mm high) constructed in stainless steel with holly green powder coating to house electronic monitoring equipment.Monitoring Progress
Committee 09/06/2008

WITHDRAWN
17/04/2008
SK258056
R1523/08CM015

25/03/08
Brierley Farm
Brinklow Rugby
Warwickshire
Installation of a ground level kiosk (dimensions 660mm x 280mm x 1570mm high) constructed in stainless steel with holly green powder coating to house electronic monitoring equipment.
Monitoring Progress
Committee 09/06/2008

WITHDRAWN
22/04/2008
SP431795
S4765/08CM014

07/03/08
Grass median to the south west of the junction of
Banbury Road/Oxford Street Southam
Warwickshire
Erection of a ground level control kiosk (dimensions 660mm x 280mm x 1110mm high) constructed in stainless steel, coloured holly green to house electronic monitoring equipment.
Monitoring Progress
Committee 06/05/2008

WITHDRAWN
21/04/2008
SP417615
S1934/08CM013

05/03/08
Land Under Arch Way to the rear of
55 Shipston Road, Stratford-Upon-Avon Warwickshire
Erection of a ground level control kiosk (dimensions 660mm x 280mm x 1110mm high) constructed in stainless steel, coloured holly green to house electronic monitoring equipment. Monitoring Progress
Committee 06/05/2008

Granted
06/05/08
SP206545
NW6/08CM012

06/02/08
Packington Landfill Site Packington Lane
Little Packington
Warwickshire
Proposed wood shredding facility.
Monitoring Progress
Committee 06/05/2008

Granted
06/05/08
SP212856
S4764/08CM011

22/02/08
Existing Pumping Station Compound
Adjacent To The Driveway Of The Mill House
Halford
Warwickshire
Erection of a ground level control kiosk (dimentions 660mm X 280mm X 1110mm high) constructed in stainless steel, coloured grey to house electronic monitoring equipment. Monitoring Progress
Delegated

Granted
04/04/08
SP258455
S1863/08CM010

22/02/08
Grass verge adjacent to the entrance of Park Homes Development
Barton Road Welford-On-Avon Warwickshire
Erection of a ground level control kiosk (dimensions 660mm x 280mm x 1570mm high) constructed in stainless steel, coloured holly green to house electronic monitoring equipment.
Monitoring Progress
Committee 06/05/2008

Granted
06/05/08
SP144515
S954/08CM009

21/02/08
Grass verge to north of
Bridge Street
opposite Sycamore Court
Little Kineton
Warwickshire
Erection of a ground level control kiosk (dimensions 660mm x 280mm x 1110mm high) constructed in stainless steel, coloured holly green to house electronic monitoring equipment.
Monitoring Progress
Committee 06/05/2008

Granted
06/05/08
SP333505
NW1982/08CM008

08/02/08
Adjacent to 75 Royal Meadow Drive Atherstone
Warwickshire
Erection of a ground level control kiosk (dimensions 660mm x 280mm x 1110mm high) constructed in stainless steel. Coloured holly green to house electronic monitoring equipment.
Monitoring Progress
Committee 06/05/2008

Granted
06/05/08
SP313985
S4761/08CM007

08/02/08
East Of No. 4 Tiddington Road Stratford-Upon-Avon WarwickshireErection of a ground level control kiosk (dimensions 660mm x 280mm x 1110mm high) constructed in stainless steel. Coloured holly green to house electronic monitoring equipment.
Monitoring Progress
Committee 06/05/2008

Granted
06/05/08
SP207548
S4760/08CM006

04/02/08
Opposite The Junction of
Dale Avenue on Banbury Road Stratford-Upon-Avon Warwickshire
Erection of a ground level control kiosk (dimensions 660mm X 280mm X 1110mm high) constructed in stainless steel, coloured Holly Green to house electronic monitoring equipment. Monitoring Progress
Committee 01/04/08

Granted
02/04/08
SP213542
S4758/08CM005

31/01/08
Footpath adjacent to bus stop to west of junction with Warwick Road & B4086/B4451 Kineton
Warwickshire
Erection of a ground level control kiosk (dimensions 660mm x x 280mm x 1110mm high) constructed in stainless steel coloured black to house electronic monitoring equipment.
Monitoring Progress
Committee 01/04/2008

Granted
02/04/2008
SP335510
S4757/08CM004

01/02/08
Grass verge opposite the junction of Mill Lane and Banbury Road Kineton WarwickshireErection of a ground level control kiosk (dimensions 600mm x 280mm x 1110mm high) constructed in stainless steel coloured holly green to house electronic monitoring equipment.
Monitoring Progress
Committee 01/04/2008

WITHDRAWN
18/03/2008
SP339509
R1211/08CM003

31/01/08
Wolston Fields Farm
Wolston Lane Wolston Warwickshire
Extraction and processing of 1.2m tonnes of sand & gravel with restoration to wet woodland and agriculture.
Monitoring Progress
Committee 06/05/2008

WITHDRAWN
02/05/2008
SP402755
R410/08CM002

07/01/08
Rugby Cement Works
Lawford Road Rugby Warwickshire
Building for reception of climafuel, for transfer to cement works as an alternative fuel.
Monitoring Progress
Committee 01/04/2008

Granted
02/04/2008
SP488756
N85/08CM001

28/11/07
Judkins Quarry
Tuttle Hill
Nuneaton
Warwickshire
Materials recycling facility and associated infrastructure for a temporary period of five years.
Monitoring Progress
Committee 09/06/2008

Awaiting Decision
SP352927


Copyright.

Plans, drawings and material submitted to the council are protected by the copyright acts (section 47, 1988 act). You may only use material which is downloaded and/or printed for consultation purposes, to compare current applications with previous schemes and to check whether developments have been completed in accordance with approved plans. Further copies must not be made without the prior permission of the copyright owner.