Welcome to Warwickshire County Council
Home
Text-only
Accessibility
Search
Me@WCC
Contact us
Help
Business & Economy
Council & Democracy
Schools & Learning
Communities
Environment & Planning
Social Care & Health
Community Safety
Leisure & Tourism
Roads & Travel
Travel in Warwickshire
Highways
Apply for it
FAQs
Report it
Consultation and Advice
Construction Details
Maintenance
Road and Bridge Construction
Select List of Contractors
Service Standards
Street Lighting
Street Works
Traffic Management
Traffic & Travel Information
Flooding
Winter Maintenance
Contact Us
Highway Maintenance Treatment Types
Treatment Type
Description
Purpose
Surface Dressing
Covering the carriageway with stone chips embedded in bitumen.
To seal the surface, improve skidding resistance and restore visual/ride quality mainly in Rural areas.
MicroAsphalt
Covering the carriageway with a veneer of cold laid surfacing material.
To seal the surface, improve skidding resistance and restore visual/ride quality mainly in Urban areas.
Haunching
Excavating the edge of the carriageway to about 500mm depth and replacing the materials with a new road structure.
To strengthen the road edge where it has failed, often prior to surface dressing or resurfacing.
Resurfacing/Overlay
Covering the carriageway with a minimum thickness of 40mm of dense hot laid surfacing material.
To replace a failed surface which is not suitable for Micro suirfacing or Surface dressing. Resurfacing restores ride quality, skidding resistance and can reduce noise.
Reconstruction
Excavating the carriageway to about 500mm depth and replacing the materials with a new road structure.
To replace a failed road structure.
Retread
Rotovating the carriageway to a shallow depth, applying additional bitumen and compacting.
To reuse existing materials from the failed road to form a new construction which can be surface dressed or resurfaced.
Recycling
In-depth recycling, remixing the existing carriageway to 500mm+ and mixing with either cement or bitumen.
To reuse existing materials from the failed road to form a new construction which can then be resurfaced.
Footway Slurry Sealing
Covering the footway with a veneer of cold laid surfacing material.
To seal the surface and restore visual/overall quality.
Footway Reconstruction
Excavating the footway to about 200mm depth and replacing the materials with a new structure.
To replace a failed footway structure.
Drainage
Providing an improved or new drainage system.
To remove water from the carriageway or relieve flooding.
Contact Us
If you have any queries or would like to request more information please contact us at the following address:
Network Management Group
Old Budbrooke Road,
Warwick
CV35 7DP
Tel: 01926 414081
Fax: 01926 414091
Email:
CountyHighways@Warwickshire.gov.uk
Tell us what you think about our site...
Search Site
Search this Site
Advanced Search
Quick Links
Quick Links
Accessibility
Bus Timetables
Consultations
Contact Us
Council Tax
Emergencies
Libraries
Jobs with WCC
Tender Opportunities
WCC Staff PC Support