- Business & finance
- Environment
- Libraries & leisure
- Registrations
- Roads & travel
- Safety and crime
- Schools & learning
- Social care & health
- The council


Highway Maintenance Treatment Types | ||||||
Treatment Type | Description | Purpose | ||||
Surface Dressing | Covering the carriageway with stone chips embedded in bitumen. | To seal the surface, improve skidding resistance and restore visual/ride quality mainly in Rural areas. | ||||
MicroAsphalt | Covering the carriageway with a veneer of cold laid surfacing material. | To seal the surface, improve skidding resistance and restore visual/ride quality mainly in Urban areas. | ||||
Haunching | Excavating the edge of the carriageway to about 500mm depth and replacing the materials with a new road structure. | To strengthen the road edge where it has failed, often prior to surface dressing or resurfacing. | ||||
Resurfacing/Overlay | Covering the carriageway with a minimum thickness of 40mm of dense hot laid surfacing material. | To replace a failed surface which is not suitable for Micro suirfacing or Surface dressing. Resurfacing restores ride quality, skidding resistance and can reduce noise. | ||||
Reconstruction | Excavating the carriageway to about 500mm depth and replacing the materials with a new road structure. | To replace a failed road structure. | ||||
Retread | Rotovating the carriageway to a shallow depth, applying additional bitumen and compacting. | To reuse existing materials from the failed road to form a new construction which can be surface dressed or resurfaced. | ||||
Recycling | In-depth recycling, remixing the existing carriageway to 500mm+ and mixing with either cement or bitumen. | To reuse existing materials from the failed road to form a new construction which can then be resurfaced. | ||||
Footway Slurry Sealing | Covering the footway with a veneer of cold laid surfacing material. | To seal the surface and restore visual/overall quality. | ||||
Footway Reconstruction | Excavating the footway to about 200mm depth and replacing the materials with a new structure. | To replace a failed footway structure. | ||||
Drainage | Providing an improved or new drainage system. | To remove water from the carriageway or relieve flooding. | ||||
| Contact Us If you have any queries or would like to request more information please contact us at the following address:
| ||||||
Warwickshire County Council, Shire Hall, Warwick CV34 4SA Telephone: 01926 410410