Case Studies

Blue Arrow Renewable Energy Solutions for Flagship Ford Dealership, Perpetual Energy, June 2008
Perpetual Energy outline their installation of an Entegrity 50kW wind turbine, rainwater harvesting system and waste to energy boiler at Ford Retail's flagship dealership in East London.

Blue Arrow Church Lawford Village Hall, June 2008
A case study investigating the energy efficiency technologies that have been installed in the newly built village hall at Church Lawford, Rugby.

Blue Arrow Orbit Heart of England Housing Group, March 2008
A case study looking at the work carried out by Orbit Heart of England Housing Group with their installation of Ground Source Heat Pumps at Lighthorne Heath

Blue Arrow Installing Solar Panels at Home - Keith Sinfield, Church Lawford, Aug 2007
Keith Sinfield shares his experience of installing solar thermal and photovoltaic panels at his home in Church Lawford.

Blue Arrow Stratford Methodist Church - Ecocongregation Energy Project, June 2007
Stratford Methodist Church carried out a project that addressed the following: an energy audit of the church premises; introduced energy efficiency measures to reduce their energy consumption; introduced green measures in gardening; set up a recycling centre in the church.

Blue Arrow Ashlawn School, Rugby - Wind Turbine Installation July 2006
Short case study on the installation of a 5 KW wind turbine at Ashlawn School, Rugby.

Blue Arrow Rugby Borough Council - Grants for Renewable Energy Installations
Background information on Rugby Borough Council's very popular small grant scheme to provide assistance to people wishing to generate their own sustainable energy.

Blue Arrow Biomass Heated Workshops and Offices
Short case study by Fuelwood Ltd and Mercia Energy Ltd on the installation of a 3kW Heizomat boiler.

Blue Arrow Working with the National Energy Centre - The Energy Efficiency Accreditation Scheme
Short overview of the scheme and how three Warwickshire organisations have achieved accreditation to date.

Blue Arrow Centrica's Home Energy Efficiency Projects in Warwickshire
Short background on projects that have been carried out in Warwickshire.

Blue Arrow Working with the Carbon Trust
Short overview of the Carbon Trust's Carbon Management Action Plans and products, with reference to take-up in Warwickshire.

Blue Arrow Ocean Power Technologies Ltd
A case study looking at the harnessing of wave energy, through the use of Ocean Power Technologies, PowerBuoy.

Blue Arrow Hill Close Gardens
A case study looking at the energy efficiency technologies used by Hill Close Gardens, Warwick, when designing their new visitor centre.

Blue Arrow Action 21 Renewable Energy Club - Case Studies

If you are involved in any energy projects in Warwickshire, please let us know so that we can help promote good practice. Case studies are welcome from a wide range of sectors: business, local authority,government organisation, charity, not-for-profit organisation, school, college, etc.

Further information is available on the following projects:




If you have any queries please contact Warwickshire County Council's Climate Change team by emailing:

To view the above document you will need Adobe Reader which is available as a free download Click here to download a free copy of Adobe Acrobat





Return to the top of the page