Reference No
and date received | Address | Proposal Summary | Decision Level and Status | Grid Reference |
S685/08CM047
30/10/08 | Burton Farm
Bishopton Stratford-Upon-Avon Warwickshire | Retrospective change of use from former contractors yard (nil use) to material recycling facility.
Monitoring Progress | Committee 20/01/2009
Awaiting Decision | SP180567 |
R1408/08CM046
22/10/08 | Boundary Farm
Withybrook Road Bulkington Bedworth Warwickshire | Extension of site area for processing and storage of compost.
Monitoring Progress | Committee 20/01/2009
Awaiting Decision | SP404866 |
NW1635/08CM045
08/10/08 | Atherstone Sewage Treatment Works
Carylon Road
Atherstone
Warwickshire | 3 x blower enclosures. Each blower enclosure will measure 1550mm x 1525mm x 1700mm (h). The enclosures will be steel coated for power plant and coloured grey (bs4800 00-a-04). The three enclosures will sit on a 150mm (h) concrete base slab measuring 10500mm (l) x 4500mm (w). Monitoring Progress | Delegated
Awaiting Decision | SP318980 |
S4365/08CM044
26/09/08
| Longstaples
Warwick Road Ettington Stratford-Upon-Avon Warwickshire | Variation of Condition 6 of Planning Permission S4365/07CM026 and Condition 4 of Planning Permission S4365/08CM028 to extend the permitted hours of operation of the materials recovery facility. Monitoring Progress | Committee 15/12/2008
Awaiting Decision | SP267501 |
NW754/08CM043
01/10/08 | Mancetter Road
Hartshill
Nuneaton
Warwickshire | Full height extension to the south east side of the evaporator tower over the lower processing building to accomodate a new staircase to provide emergency exit and operational access. Proposed extension to the north east elevation of the tower at low level to allow improved access to process equipment. Proposed replacement of 3 no. existing storage tanks with 3 no. new tanks at a height of 19.4m Monitoring Progress | Committee 18/11/2008
Awaiting Decision | SP33195 |
NW57/08CM042
23/09/08 | Former Shale Tip
Land on the corner of the Common and Merevale Lane Atherstone
Warwickshire | Compaction of former colliery spoil to create a stable landform for the construction of a sustainable resource recovery park comprising the renewable energy generation facilities of a biomass plant and an anaerobic digestion plant, together with associated plant and buildings, hard standing, access routes and landscaping.
Monitoring Progress | Committee 15/12/2008
Awaiting Decision | SP275975 |
R1529/08CM041
29/09/08 | Manor Farm Frankton SPS Main Street Frankton
Rugby Warwickshire | Extention of the existing sewerage pumping station to provide space for additional underground storm water storage. This involves the change of use of land from agricultural land.
Monitoring Progress | Committee 18/11/2008
Granted
19/11/2008 | SP423700 |
R1528/08CM040
22/09/08 | Long Lawford STW
Chapel Street
Long Lawford
Warwickshire | Erection of three GRP kiosks associated with the upgrading of infrastructure at Long Lawford STW.
Monitoring Progress | Delegated
Awaiting Decision | SP469763 |
R1448/08CM039
22/09/08 | Bramcote Wolvey STW
Bazzard Lane
Bramcote
Warwickshire | Erection of 1no. new control enclosure, 1no. emergency shower and eyewash unit, 1no. washwater booster kiosk and associated permitted development works.
Monitoring Progress | Delegated
Granted
11/11/08 | SP409886 |
R410/08CM038
17/09/08 | Malpass Farm
Parkfield Road
Rugby
Warwickshire | Development of a climafuel manufacturing facility to supply Rugby Cement Works with solid recovered fuel (climafuel) manufactured from mixed household and commercial and industrial wastes. The facility would combine a range of waste treatment, sorting, recycling and processing equipment to separate and remove recyclable materials from the mixed waste, and shred and biodry non-recycable materials into climafuel.
Monitoring Progress | Committee 20/01/2009
Awaiting Decision | SP489761 |
S965/08CM037
16/09/08 | The Old Cement Works Southam Quarry
Coventry Road
Southam
Warwickshire | Change of use from landfill for cement kiln dust (ckd) arising from Southam Cement Works to landfill for nodulised cement kiln bypass dust (bpd) arising from Rugby Cement Works landscaping and habitat creation. Monitoring Progress | Committee 15/12/2008
Awaiting Decision | SP420633 |
N23/08CM036
09/09/08 | Sita Coventry Metals Recycling Depot
Ironbridge Works
Three Spires Industrial Estate Ibstock Road
Coventry | Construction of noise attenuation barrier.
Monitoring Progress | Committee 18/11/08
Granted
19/11/2008 | SP353845 |
NW6/08CM035
29/08/08 | Packington Landfill Site Packington Lane
Little Packington
Meriden
Warwickshire | Development and operation of a new temporary open green waste composting facility, including construction of a composting pad surface water lagoon, screen mound use of existing access and construction of internal haul route.
Monitoring Progress | Committee 18/11/2008
Awaiting Decision | SP212857 |
NW6/08CM034
29/08/08 | Packington Landfill Site
Packington Lane
Little Packington
Nr Meriden
Warwickshire | Development and operation of a wood recycling facility including the preparation at the base with suitable granular material. The facility will use existing access and construction of internal haul road. Monitoring Progress | Committee 18/11/2008
Awaiting Decision | SP212857 |
S965/08CM033
02/09/08 | The Old Cement Works Southam Quarry
Long Itchington
Coventry Road
Southam
Warwickshire | Development of a climafuel manufacturing facility to supply rugby cement works with solid recovered fuel (climafuel) manufactured from mixed household and commercial and industrial waste. The facility would combine a range of waste treatment, sorting,recycling and processing equipment to separate and remove recyclable materials from the mixed wastes, and to shred and biodry non-recyclable materials into climafuel.
Monitoring Progress | Committee 20/01/2009
Awaiting Decision | SP42164 |
NW864/08CM032
21/07/08 | Coleshill Quarry
Gorsey Lane Coleshill Warwickshire | Change of use of land to materials recycling facility and associated equipment store. Monitoring Progress | Committee 07/10/2008
Granted
08/10/08 | SP203903 |
NW754/08CM031
09/07/08 | De Mulder & Sons Ltd
Mancetter Road
Hartshill Nuneaton Warwickshire | Construction of a new vehicle and trailer park incorporating the remodelling and partial retention of unauthorised bunding at De Mulder & Sons Ltd Mancetter Road Hartshill Warwickshire
Monitoring Progress | Committee 07/10/2008
Refused
22/10/08 | SP33195 |
N85/08CM030
21/07/08 | Judkins Quarry
Tuttle Hill Nuneaton Warwickshire | Installation (retrospective) of a replacement flare and associated gas plant within the permitted landfill gas utilisation compound, including the relocation and removal of two store rooms and gas plant.
Monitoring Progress | Committee 07/10/2008
Granted
08/10/08 | SP352927 |
R821/08CM029
17/06/08 | Ryton Mill, London Road Ryton-On-Dunsmore Warwickshire | Variation of Condition 1 of Application No. R821/06CM023 to provide a further two years to 14th August 2010.
Monitoring Progress | Committee 08/09/2008
Granted
09/09/08 | SP375751 |
S4365/08CM028
04/07/08 | Longstaples
Warwick Road Ettington Stratford-Upon-Avon Warwickshire | Single storey extension to side of proposed Materials Recovery Facility building.
Monitoring Progress | Committee 08/09/2008
Granted
09/09/08 | SP267501 |
R410/08CM027
27/06/08 | Rugby Cement Works
Lawford Road Rugby Warwickshire | Retention of weighbridge ticket kiosk for improved monitoring security of inbound and outbound HGV's carrying raw materials at entrance access to Rugby Cement Works. Cement tankers are loaded/monitored elsewhere on site. Monitoring Progress | Committee 08/09/2008
Granted
10/09/08 | SP484755 |
NW6/08CM026
11/06/08 | Packington Landfill Site Packington Lane Meriden Warwickshire | Landfill gas utilisation facility to generate electricity from landfill gas using reciprocating engines at the Packington Landfill site.
Monitoring Progress | Committee 07/10/2008
Granted
08/10/08 | SP212857 |
R1448/08CM025
25/06/08 | Bramcote Wolvey STW
Bazzard Lane Bramcote Warwickshire | Erection of two new chemical dosing units, an emergency shower and eyewash unit and associated permitted development works.
Monitoring Progress | Delegated
Granted
19/08/2008 | SP409886 |
W1974/08CM024
23/06/08 | Woodcote Avenue/
Beehive Hill
Kenilworth
Warwickshire | Construction/erection of a ground control kiosk and pumping shaft tank storage facility and permanent access point from Beehive Hill. Monitoring Progress | Committee 08/09/2008
Granted
09/09/08 | SP278732 |
S4510/08CM023
05/06/08 | Stratford Agripark
Wincot Lands
Clifford Chambers
Nr Stratford-Upon-Avon
Warwickshire | Erection of single storey portal framed building to accommodate waste transfer station, for animal carcasses, together with internal offices, external service yard, access roadway and landscaping.Monitoring Progress | Committee 18/11/2008
Awaiting Decision | SP178491 |
R1318/08CM022
01/05/08 | Hinckley Service Centre
A5 Watling Street Hinckley Warwickshire | The erection of new recovery & transfer building, improvements to existing office building, provision of designated vehicle and car parking, the relocation and erection of new metals recovery and storage building, the provision of open bays for metal segregation, the relocation of weighbridge and wheel cleaning facilities, the provision of security palisade fencing, site drainage improvements and hard standing.
Monitoring Progress | Committee 22/07/2008 Granted
23/07/08
| SP404923 |
S1751/08CM021
25/04/08 | Ufton Landfill Site
Ufton
Southam
Royal Leamington Spa Warwickshire | New reception compound including material recovery, in-vessel composting and office facilities. Monitoring Progress | Committee 22/07/2008 Granted
08/10/08 | SP390612 |
NW1317/08CM020
14/04/08 | Blabers Hall Farm
Fillongley Warwickshire | Variation of Condition 9 of Planning Permission consent NW1317/06CM013 to increase loads currently permitted from six per week to a maximum of ten per day.
Monitoring Progress | Committee 09/06/2008
Awaiting Decision | SP252864 |
S4757/08CM019
07/04/08 | Grass verge opposite the junction of Mill Lane and Banbury Road Kineton Warwickshire | Erection of a ground level control kiosk (dimensions 660mm x 280mm x 1570mm high) constructed in stainless steel, coloured holly green to house electronic monitoring equipment.
Monitoring Progress | Committee 09/06/2008
Granted
07/07/2008 | SP339509 |
S1092/08CM018
31/03/08 | Unit 6
Butlin House
Bourne End
Kineton Road Industrial Estate Southam Warwickshire | Alteration to existing building structure, erection of perimeter fencing and change of use of land and buildings to waste transfer station and materials recycling facility.
Monitoring Progress | Committee 09/06/2008
Granted
10/06/08 | SP413611 |
R1524/08CM017
04/04/08 | Wood Street
Rugby Warwickshire | Installation of a kiosk (660mm x 280mm x 1110mm) to house electronic equipment to monitor the overflow level of a combined storm overflow that overflows into a nearby watercourse. The kiosk will be linked by an underground duct to the combined storm overflow manhole.
Monitoring Progress | Committee 09/06/2008
Granted
22/05/08 | SP507758 |
NW1987/08CM016
31/03/08 | Grass Verge to West of Main Road
Shuttington
Warwickshire | Installation of a ground level kiosk (dimension 660mm x 280mm x 1570mm high) constructed in stainless steel with holly green powder coating to house electronic monitoring equipment.Monitoring Progress | Committee 09/06/2008
WITHDRAWN
17/04/2008 | SK258056 |
R1523/08CM015
25/03/08 | Brierley Farm
Brinklow Rugby
Warwickshire | Installation of a ground level kiosk (dimensions 660mm x 280mm x 1570mm high) constructed in stainless steel with holly green powder coating to house electronic monitoring equipment.
Monitoring Progress | Committee 09/06/2008
WITHDRAWN
22/04/2008 | SP431795 |
S4765/08CM014
07/03/08 | Grass median to the south west of the junction of
Banbury Road/Oxford Street Southam
Warwickshire | Erection of a ground level control kiosk (dimensions 660mm x 280mm x 1110mm high) constructed in stainless steel, coloured holly green to house electronic monitoring equipment.
Monitoring Progress | Committee 06/05/2008
WITHDRAWN
21/04/2008 | SP417615 |
S1934/08CM013
05/03/08 | Land Under Arch Way to the rear of
55 Shipston Road, Stratford-Upon-Avon Warwickshire | Erection of a ground level control kiosk (dimensions 660mm x 280mm x 1110mm high) constructed in stainless steel, coloured holly green to house electronic monitoring equipment. Monitoring Progress | Committee 06/05/2008
Granted
06/05/08 | SP206545 |
NW6/08CM012
06/02/08 | Packington Landfill Site Packington Lane
Little Packington
Warwickshire | Proposed wood shredding facility.
Monitoring Progress | Committee 06/05/2008
Granted
06/05/08 | SP212856 |
S4764/08CM011
22/02/08 | Existing Pumping Station Compound
Adjacent To The Driveway Of The Mill House
Halford
Warwickshire | Erection of a ground level control kiosk (dimentions 660mm X 280mm X 1110mm high) constructed in stainless steel, coloured grey to house electronic monitoring equipment. Monitoring Progress | Delegated
Granted
04/04/08 | SP258455 |
S1863/08CM010
22/02/08 | Grass verge adjacent to the entrance of Park Homes Development
Barton Road Welford-On-Avon Warwickshire | Erection of a ground level control kiosk (dimensions 660mm x 280mm x 1570mm high) constructed in stainless steel, coloured holly green to house electronic monitoring equipment.
Monitoring Progress | Committee 06/05/2008
Granted
06/05/08 | SP144515 |
S954/08CM009
21/02/08 | Grass verge to north of
Bridge Street
opposite Sycamore Court
Little Kineton
Warwickshire | Erection of a ground level control kiosk (dimensions 660mm x 280mm x 1110mm high) constructed in stainless steel, coloured holly green to house electronic monitoring equipment.
Monitoring Progress | Committee 06/05/2008
Granted
06/05/08 | SP333505 |
NW1982/08CM008
08/02/08 | Adjacent to 75 Royal Meadow Drive Atherstone
Warwickshire | Erection of a ground level control kiosk (dimensions 660mm x 280mm x 1110mm high) constructed in stainless steel. Coloured holly green to house electronic monitoring equipment.
Monitoring Progress | Committee 06/05/2008
Granted
06/05/08 | SP313985 |
S4761/08CM007
08/02/08 | East Of No. 4 Tiddington Road Stratford-Upon-Avon Warwickshire | Erection of a ground level control kiosk (dimensions 660mm x 280mm x 1110mm high) constructed in stainless steel. Coloured holly green to house electronic monitoring equipment.
Monitoring Progress | Committee 06/05/2008
Granted
06/05/08 | SP207548 |
S4760/08CM006
04/02/08 | Opposite The Junction of
Dale Avenue on Banbury Road Stratford-Upon-Avon Warwickshire | Erection of a ground level control kiosk (dimensions 660mm X 280mm X 1110mm high) constructed in stainless steel, coloured Holly Green to house electronic monitoring equipment. Monitoring Progress | Committee 01/04/08
Granted
02/04/08 | SP213542 |
S4758/08CM005
31/01/08 | Footpath adjacent to bus stop to west of junction with Warwick Road & B4086/B4451 Kineton
Warwickshire | Erection of a ground level control kiosk (dimensions 660mm x x 280mm x 1110mm high) constructed in stainless steel coloured black to house electronic monitoring equipment.
Monitoring Progress | Committee 01/04/2008
Granted
02/04/2008 | SP335510 |
S4757/08CM004
01/02/08 | Grass verge opposite the junction of Mill Lane and Banbury Road Kineton Warwickshire | Erection of a ground level control kiosk (dimensions 600mm x 280mm x 1110mm high) constructed in stainless steel coloured holly green to house electronic monitoring equipment.
Monitoring Progress | Committee 01/04/2008
WITHDRAWN
18/03/2008 | SP339509 |
R1211/08CM003
31/01/08 | Wolston Fields Farm
Wolston Lane Wolston Warwickshire | Extraction and processing of 1.2m tonnes of sand & gravel with restoration to wet woodland and agriculture.
Monitoring Progress | Committee 06/05/2008
WITHDRAWN
02/05/2008 | SP402755 |
R410/08CM002
07/01/08 | Rugby Cement Works
Lawford Road Rugby Warwickshire | Building for reception of climafuel, for transfer to cement works as an alternative fuel.
Monitoring Progress | Committee 01/04/2008
Granted
02/04/2008 | SP488756 |
N85/08CM001
28/11/07 | Judkins Quarry
Tuttle Hill
Nuneaton
Warwickshire | Materials recycling facility and associated infrastructure for a temporary period of five years.
Monitoring Progress | Committee 09/06/2008
Awaiting Decision | SP352927 |